ASEAN Green Corridor

A proposed regional development concept linking clean energy, cross-border connectivity, sustainable mobility and institutional coordination around the Strait of Malacca.

Five gateways.
A shared regional vision.

Explore the geography behind a platform designed to connect resources, industry, logistics and institutions.

Five gateways around the Strait of MalaccaAceh in northern Sumatra, Malacca and Johor on the Malay Peninsula, Singapore, and the Riau Islands south of Singapore. Lines identify labels, not physical infrastructure routes.SUMATRAMALAYSIASTRAIT OF MALACCAAcehMalaccaJohorSingaporeRiau IslandsN

Indicative gateway locations · Natural Earth

Resources & supply

Renewable energy potential and natural-resource capacity form the proposed upstream supply foundation.

Industry & demand

Industrial activity, manufacturing and port infrastructure connect energy supply with productive demand.

Maritime logistics

Maritime logistics and cross-border connectivity provide a strategic interface with Singapore.

Institutional coordination

An institutional and commercial centre connecting regional projects with international counterparties.

Regional connectivity

Archipelago connectivity links the corridor with regional and international markets.

Three project families.
Designed as one system.

Phase I connects energy supply, transmission and productive end-use. These are the proposed relationships, not a statement of completed infrastructure.

  1. GEINEP

    Energy supply

    Green Ecology Indonesia New Energy Project

    Renewable and green-fuel supply capacity in Indonesia is envisioned as the upstream foundation.

  2. ISCEIP

    Cross-border transmission

    Indonesia–Singapore Cross-border Electricity Transmission

    A proposed transmission backbone would connect energy supply with Singapore and regional demand.

  3. SSSTPP

    Sustainable mobility

    Safe Smart Sustainable Transport Platform

    Digitally integrated, sustainable transport and logistics are intended to provide productive downstream demand.

Shared foundations: governance · capital strategy · technology · implementation

Progress follows evidence.

Five gated stages provide an implementation framework. Advancement depends on verifiable readiness, rather than a published timetable.

  1. 01

    Platform Preparation

    Legal and governance structures, scope validation and initial stakeholder alignment.

  2. 02

    Phase I Validation

    Technical, regulatory and financial validation against defined evidence requirements.

  3. 03

    Coordinated Construction

    Construction sequenced around verified approvals, readiness and project dependencies.

  4. 04

    Corridor Operations

    Commissioning, operating integration and performance evidence.

  5. 05

    Regional Expansion

    Additional gateways and project families informed by verified operating experience.

A clear language
for project status.

Document verification is distinct from regulatory, governmental or financing approval. Each material claim must be assessed on its own evidence.

Verified
Supported by specific, dated documentary evidence with a defined scope.
In Progress
An active process is underway, with the relevant parties and expected output identified.
Planned
A defined action is scheduled, with responsibility and a target date.
Proposed
Under consideration, without a formal commitment or initiated process.
Long-term Vision
A direction of travel that is not yet formally scheduled or committed.

The descriptions on this page explain the proposed corridor concept. They do not confirm that approvals, contracts, funding or construction milestones have been secured.

An initiative within HEARTS.

Energy, infrastructure and sustainability are initiative themes within the HEARTS framework, particularly Resources and Technology. They are not separate firm-wide sectors.

Our sector framework is global. Individual initiatives may be regional, national or cross-border depending on the opportunity.

References to capital strategies, financing pathways, institutional investors or potential funding sources describe advisory work and strategic considerations only.

Discuss the proposed corridor.

For questions about the concept, its project families or evidence requirements.

Contact ASEANPILOT